Build the foundry.
Prove the advantage.
A shared platform for specialized materials made in orbit. Three claims to test, one traceable path from experiment to production.
THE RESEARCH CONTRACT
A source, a test, and a boundary for every claim.
01 / MATERIALS
Start with a measurable
difference.
02 / FOUNDRY DESIGN
Share the infrastructure.
Respect the process.
Common steps suggest reusable services. Simultaneous operation also needs power, thermal, observation and disturbance margins.
Can these stages run together?
ONE CAPSULE · SEPARATE CARTRIDGES03 / FLEET OPERATIONS
Compare the scheduler
with simpler choices.
Every policy receives the same jobs, durations and outcomes. The comparison includes late, failed and undelivered batches.
04 / EXECUTION PLAN
The next steps,
with a definition of done.
Saved in this browser. Export notes to share them with your teammate; task status lives in the project content files.
05 / DATA & COMPUTE
Scale the analysis
after the measurement works.
MIT ENGAGING
Run-level extraction.
Independent simulation seeds.
Bounded transfers, reproducible manifests, and Slurm arrays. The current benchmark needs CPUs; a GPU becomes useful only for a validated image model.
SSH availability and submitted jobs are recorded in the runbook. An eight-hour SSH connection is separate from a compute allocation.